bim model

BIM model check case study

Laboratory refurbishment in Germany

Laboratory refurbishment in Germany

HVAC design for constructability and design for maintainability reviews and HVAC normative compliance checks were done on chemical industrial corporate laboratory extension project spanning over 14,200 sqm. TÜV SÜD model check was also done during the technical design stage. TÜV SÜD model check including design review only took 4-man days. 

 

Next Steps

Site Selector