Ensure the operational reliability of your PV power plant.
Ensure the operational reliability of your PV power plant.
The Final Acceptance Test is an evaluation carried out during the commissioning phase by an independent third party to demonstrate completion of the plant, as well as correctness and high quality of work. The FAT involves a review of design, labeling of equipment and a visual inspection of the facility. The results of the FAT are then presented in a detailed report. If the FAT is conducted during plant operation, the monitoring system also verifies the functionality of the plant.
The Final Acceptance Test provides certainty and confidence to your PV project by verifying the fulfillment of technical and safety standards. Without an FAT, there may be a loss of long-term sustainable protection of revenue. Warranty compliance for future warranty claims against manufacturers may also be affected.
Owners and operators need to provide project design documentation (as build documentation), installation license, information about key components (solar panels and inverters), calibration lists of the installed meteorological sensors, technical manuals and maintenance manuals.
TÜV SÜD helps you minimize risk by ensuring your PV installations are in line with specifications, standards and regulations.
Both commercial and private customers regard TÜV SÜD’s tests and inspections as a guarantee of safety and reliability. Our Final Acceptance Tests comply with IEC 62446.
Site Selector
Global
Americas
Asia
Europe
Middle East and Africa