RAIL CASE STUDY: ISA assessments for signalling in Saudi Arabia

YOUR CONNECTION FOR SAFETY AND SECURITY, RELIABILITY AND EFFICIENCY

YOUR CONNECTION FOR SAFETY AND SECURITY, RELIABILITY AND EFFICIENCY

Independent Safety Assessment of Electronic interlocking, ETCS L2 and centralised traffic control for a 2,400 km long newly built railway network

FACTS AT A GLANCE

CUSTOMER: Thales Ground Transportation Systems

COUNTRY: Kingdom of Saudi Arabia

ABOUT THE PROJECT:

  • Electronic interlocking (IXL), ETCS L2 and Centralised Traffic Control (CTC) for 2,400 km long, new railway line network from the north to the south of Saudi Arabia (North-South-Railway - NSR)
  • Track design for a maximal train speed of 250 km/h (passenger trains
    250 km/h, freight trains 120 km/h, minerals trains 100 km/h)
  • Start of commercial operation in 2017

PROJECT PERIOD: original project 07/2011 to 09/2017, follow-up projects (rail network extensions) and signalling system updates are on-going until today

SERVICES PROVIDED:Round flag Saudi Arabia

  • Independent Safety Assessment of NSR signalling system: 
    • Assessment of the specific application (seven sections)
    • Assessment of the generic application interlocking
    • Assessment of generic data engineering process for the site-specific data
    • Assessment of ETCS interworking “Trackside” and “On-board”
    • Site inspections for each section witnessing testing and commissioning activities

STANDARDS COVERED:

  • EN 50126
  • EN 50128
  • EN 50129

What was the challenge?

The North-South Railway (NSR) project in Saudi Arabia is a major railway infrastructure initiative aimed at developing a modern and efficient rail network of 2,400 km length connecting the northern and southern regions of the country. The project is intended to facilitate the transportation of passengers and freight, promote economic development, and enhance connectivity within Saudi Arabia and the broader Gulf region.

The railway includes 6 passenger stations, 8 intermodal terminals and loading terminals at currently 3 mining areas. The line crosses some very harsh environments. At the moment of first commissioning, it was the longest railway line equipped with ETCS L2. The signalling system is composed of:

Furthermore, there are interfaces to:

  • Rolling Stock Management System (based on RFID tags technology with lineside check points)
  • Automated train condition supervision (check points)
  • Maintenance centre

The project was divided into two main phases for commissioning, the so-called Mineral Line and the Passenger Line. Contractor of the project was the Joint Venture Thales-Saudi-Bin Laden Group (SBG).

What was our solution?

TÜV SÜD was appointed by Thales Ground Transportation Systems to carry out an Independent Safety Assessment of the specific application in accordance to the relevant CENELEC standards EN 50126, EN 50128 and EN 50129 as well as underlying reference standards. The assessment also included the inspection of the data preparation for the specific application and the installation on site. 

 

What was the customer benefit?

The Independent Safety Assessment carried out by TÜV SÜD ensures the safety and supported reliability and quality of the project. It was also the basis of final approval by the authority of the Signalling and ETCS L2 systems.


Being part of the North-South Railway Project in Saudi Arabia as an independent safety assessor was very exciting. Ensuring the correct and safe implementation of the signalling system and its main components, IXL and ETCS L2, for such a long distance, leading to a successful approval for the customer, was a great experience that also broadened our know-how on an international scale.

Matthias Henze

Lead inspector for Command, Control and Signalling (CCS) and CBTC systems

Learn more about our global rail projects

TÜV SÜD - a global player in safety railway services

TÜV SÜD - A global player in safety railway services

TÜV SÜD is your partner when it comes to inspection, testing, certification, and training services along all phases of a railway project

Learn More

Rail project ILint
CASE STUDY

Germany / Austria

Various inspection, safety assessment and certification services as DeBo and AsBo for the first hydrogen-fuelled multi-unit train set (Coradia iLint 54)

Learn More

Rail case study VDE8 Germany
CASE STUDY

Germany

Project VDE 8: Verification of high-speed track infrastructure and signalling technology including European Train Control System (ETCS)

Learn More

Rail project Israel
CASE STUDY

Israel

Railway System Safety Assessment and track inspection for high-speed train connection between Jerusalem and Tel Aviv

Learn More

Rail case study Denmark
CASE STUDY

Denmark

NoBo verification for Denmark's first high-speed railway which will run the new line Copenhagen-Ringsted (NLCR)

Learn More

Rail Project Turkey Marmaray
CASE STUDY

Turkey

Safety Assessment and inspection of the Marmaray Tunnel connecting two continents

Learn More

Next Steps

Site Selector