What was the challenge?
The German Unity Transport Project (VDE) is one of the centerpieces of the trans-European corridor from Scandinavia to the Mediterranean. From 2012 to 2020, the extension of the high-speed railway line Berlin - Nuremberg was the longest construction yard in Germany. The line allows trains to run with peak velocities of up to 300 km/h.
At these high speeds, reliable recognition and interpretation of fixed signals is barely possible for train drivers. Given this, the route requires cutting-edge automated train control and digital signalling systems. The European Train Control System (ETCS) forms part of a future Europe-wide railway control system that complies with uniform standards. These state-of-the-art train protections and digital signalling technology is required to ensure safety also during emergencies.
Factors imperative for the success of such a large project particularly include interoperability and safety in addition to speed, environmental compatibility, suitability for mass transportation and feasibility. The high speeds of up to 300 km/h planned for the project and the difficult topography require costly and labour-intensive civil engineering structures such as viaducts, tunnels and wind and sound barriers. The tunnel structures in particular must meet high demands in the field of incident prevention, detection, self-rescue and rescue of others.
Due to our expertise and many years of experience, our team was commissioned to work with the Notified Body Eisenbahn-Cert to assess the requirements and elements of the demanding stage in terms of interoperability and safety.
Testing of the new sections of VDE 8 started in September 2012. With almost 20 rail experts and assessors we ensured that safety was maximised, but also that the construction process benefited from better schedule control and cost savings, as potential difficulties at interfaces were identified and eliminated before they turned into problems.
Right from the design stage of the project, our expert team provided independent third-party reviews and tests to ensure smooth and successful interaction of the planned large number of systems. TÜV SÜD Rail reviewed the route plans and the systems in place, from interlocking systems, transformer stations and train control systems (ETCS) to the safety illumination and emergency call systems for all 27 of the tunnels. Further areas included in testing were the alarm system and the security of data transmission.
What was the customer benefit?
We ensured an interoperable and safe railway system including parameters as track gauge, clearance profile, track resistance, reliable civil works, and safe railway tunnels, including fire detection, resistance and fighting, as well as evacuation and rescue facilities.
The project benefited from improved schedule reliability and saved costs because interface problems were identified and eliminated in advance. We allowed for a flexible response to project requirements by allocating the service to several auditors.
TÜV SÜD is one of only a handful of companies covering the entire process from assessment of the first plans to driving tests of rolling stock – worldwide.
TÜV SÜD is your partner when it comes to inspection, testing, certification, and training services along all phases of a railway project
Learn More
Various inspection, safety assessment and certification services as DeBo and AsBo for the first hydrogen-fuelled multi-unit train set (Coradia iLint 54)
Learn More
Railway System Safety Assessment and track inspection for high-speed train connection between Jerusalem and Tel Aviv
Learn More
NoBo verification for Denmark's first high-speed railway which will run the new line Copenhagen-Ringsted (NLCR)
Learn More
Independent safety assessment of signalling, ETCS L2 and automated train protection for a 2,400 km long new railway line which provides transport services to the pilgrims
Learn More
Site Selector
Global
Americas
Asia
Europe
Middle East and Africa