E-Mobility has been a trending market for many years and the production of battery cells/modules/packs are rising with the increasing number of new battery production facilities worldwide. The demand for batteries will reach 4.7 GWh by 2030 in Europe. This is boosted by the increasing need for mobility and portable devices. However, there are many compliance and safety standards such as CE conformity, to keep up with when setting up a new battery production plant and throughout the battery production supply chain.
Complete the 5 minutes CE readiness check to see how well you know CE conformity.
As the right technical partner for machinery and safety requirements for battery plant owner, TÜV SÜD is the one-point contact between plant owner and suppliers to facilitate seamless communication. We provide continuous status reporting of compliance fulfillment and gap analysis with measures needed based on regular communication. In addition, we understand your concerns when setting up a new battery production plant:
Supplier management - It is important to ensure that the suppliers manufacture and deliver equipment in accordance with all regulations and specification relevant for the country of placing the equipment on the market. They must be able to provide full documentation including certificates, manuals, and technical data sheets. Their operation should also be in accordance with social responsibility regulations.
Compliance and safety - As the equipment and installations must be considered as a workplace for many employees, compliance with national HSE-requirements is necessary. The operation of the plant must comply with all applicable national safety regulations and, at best, international best-practice approaches such as wastewater-treatment, electrical safety and many more.
Building and operational permit - According to local building law, the fire protection concept and the corresponding safety systems must be finally approved by the building authorities.
Timeline and cost - It is also vital that the setting up of a battery production plan proceeds according to schedule and milestones set in the initial planning phase. This includes ensuring suppliers delivery in accordance with the timeline. Any delay can result in a loss of money.
TÜV SÜD accompanies you throughout the whole validation process until market access is gained. Our expertise helps to increase the efficiency in the R&D process, and we go extra miles for our customers: validation plan definition, test arrangement, operating test labs and more.
From battery production to battery testing:
Testing of components, equipment and battery prototypes (module, cell, system)
Performance / lifecycle tests under different climatic conditions for battery systems
Battery module parameter determination
High performance cycling tests
Environmental / Durability tests (vibration, dust, humidity, EMC, chemical influence)
2nd life battery analysis and tests
Battery certification
Type Approval
Pedelec and e-bike
Charging equipment
Risk-based fire protection strategy within LIB cell production based on the importance of regulations and hazard evaluation.
Learn More
Together with EBA250, Northvolt and Microvast, TÜV SÜD discussed the issues connected to sustainability with you.
Learn More
Ensure high performance and reliability of innovative battery systems
Learn More
Outlines Lithium battery testing required under UN/DOT 38.3.
Learn More
Find out solutions to target, improve and monitor measures to establish a sustainable value chain
Learn More
Develop sustainable battery, vehicle and infrastructure solutions
Learn More
Site Selector
Global
Americas
Asia
Europe
Middle East and Africa