Railway certification according to TSI and NNTR (NoBo, DeBo)
Ensure the safety, efficiency, and seamless operation of rail systems across different countries.What is TSI and NNTR railway certification?
Railway certification ensures that vehicles, infrastructure, energy supply, signalling systems and interoperability constituents in the EU are conform with TSI (Technical Specifications for Interoperability) and additional NNTR (Notified National Technical Rules) requirements.
TSI specifications cover infrastructure, rolling stock, energy, control-command and signalling, operation and traffic management. NNTR apply when a TSI does not cover a particular technical aspect, or when an EU member state has its own additional requirements. TSI certification is done by Notified Bodies (NoBo’s), NNTR certification by Designated Bodies (DeBo’s), following the same basic assessment and certification rules. Railway certification according to TSI and NNTR requirements ensures that both European-wide standards and local requirements are met.
Railway certification, NoBo and DeBo services from TÜV SÜD help rolling stock manufacturers, suppliers, railway operating companies, and infrastructure managers gain approval from the relevant governing bodies. The certification involves a thorough assessment process to ensure safety and interoperability. In addition, our ISO 17025 accredited laboratories help you to manage a variety of tests efficiently.
Why railway certification is important
The TSI and NNTR railway certification process enables efficient European rail network cross-border interoperability and maintains high safety standards. Conformity with TSI and NNTR is a legal requirement for the authorisation, and operation of rolling stock, signalling technology, infrastructure, and energy supplies. Conformity assessment and certification is also an essential part of retrofitting, refurbishment, and modification projects, even when an authorisation is not required.
The conformity assessment process involves rigorous testing and documentation reviews to confirm conformity to TSIs and NNTRs.
To understand the different approval requirements, and how they can be merged and consolidated, in-depth knowledge is required. The interpretation of these complex requirements, as well as the coordination between the various stakeholders, from Notified Bodies and Designated Bodies to independent safety assessment bodies (ISA and AsBo), the European (ERA) and national safety authorities (NSAs), can be particularly challenging.
Why choose TÜV SÜD for railway certification?
With extensive international experience in railway testing, assessment and certification, TÜV SÜD supports manufacturers, suppliers and operators throughout the conformity assessment and approval process.
As a recognised Notified Body (NoBo), Designated Body (DeBo) in numerous countries and Assessment Body (AsBo), we combine regulatory expertise with testing capabilities from our ISO 17025 accredited laboratories. This enables us to support complex railway projects efficiently from a single source.
Our experts support you with:
- TSI and NNTR conformity assessment for railway subsystems and interoperability constituents
- Complex and multidisciplinary rail projects
- Retrofit, refurbishment and modification projects
- New technologies, including hydrogen- and battery-powered rolling stock
- Special vehicles, including on-track machines (OTM) and road-rail vehicles
- Independent safety assessment (ISA) for railway, metro and tram systems
Our railway experts have extensive experience with European and national approval requirements, and many of our inspectors are recognised experts of the German Federal Railway Authority (EBA). Through our involvement in international standardisation committees, we also keep track of regulatory developments and can identify changing requirements at an early stage.
Experienced project management, technical expertise and a broad assessment and testing portfolio help you develop an efficient certification strategy, reduce interfaces and minimise the risk of costly project delays.