Choose another country to see content specific to your location

//Select Country

Emerging from Lockdown Reoccupying your Building

Guidance note

What is the TÜV SÜD MEP Audit?

By combining official requirements and recommendations with extensive MEP know-how, TÜV SÜD, have compiled a risk criteria catalogue. The criteria cover protective measures to be taken in the re-energizing of the building

MEP Audit – The Process and Systems

Following a detailed survey of your buildings engineering systems, we compile a schedule of works to be undertaken on each of the building engineering systems. The audit will focus on the following systems as recommended in the CIBSE guide issued 14th May 2020 (Version 3).


WHY DOWNLOAD THE GUIDANCE NOTE?

  • Gain an insight managing risk during reoccupation of buildings
  • Understand the potential issues with putting equipment back into use 
  • Plan your reoccupation step-by-step

Next Steps

Select your location

Global

Americas

Asia

Europe

Middle East and Africa