Choose another country to see content specific to your location
//Select CountryHave a requirement or need some help? Contact us to find out how we can help you.
Case Study
Industry: Real Estate – Lift, Cranes and Conveyors
Project Value: Confidential
Construction dates: 2018 - 2029
Services provided: Facade Access Consultancy
Quayside Quarter is the regeneration and redevelopment of the former Honeymonster Factory site in Southall. The masterplan is composed of nine distinct buildings, with varying building typologies forming the masterplan.
Block A is seen as being the landmark element of the scheme, which is reflected in its unique architectural design and materiality, setting it apart from the other tall buildings within the masterplan. Block A addresses the masterplan’s main public space and provides a number of opportunities for canal-side cafés and restaurants. Therefore, the tallest residential block is equipped with a track mounted BMU complete with glass lifting facility to portray the building image.
The Canalside typology the rail-side blocks is designed with openable windows allowing access from inside the floor. The windows will be easily maintained by tenants / occupants.
The creative hub is a distinct typology and provides the majority of the commercial offer within the masterplan. The building will be equipped with a telescopic BMU with telescopic mast to park theunit behind glazed box above roof level.
Select your location
Global
TÜV SÜD Global
Asia
Europe
Austria
Belgium
Bosnia and Herzegovina
Croatia
Czech Republic
Denmark
France
Germany
Hungary
Italy
Netherlands
Poland
Romania
Slovakia
Slovenia
Spain
Sweden
Switzerland
Turkey
United Kingdom