Asset Integrity Management

Asset Integrity Management

Optimise your plant safety and integrity management programme

Optimise your plant safety and integrity management programme

What is Asset Integrity Management (AIM)?

Asset integrity management (AIM) ensures that the right processes, procedures and tools are in place to ensure that your plant assets function safely, effectively and efficiently at every stage of its lifecycle.

Why is having an Asset Integrity Management programme important?

A plant integrity programme ensures that all aspects of operations essential to safety and integrity are properly designed, constructed, tested, operated, inspected and maintained in a sustainable, holistic and systematic way. This ensures service and performance integrity without compromising health, safety and the environment.

TÜV SÜD helps to ensure that your plant runs safely and reliably

TÜV SÜD’s Asset Integrity Investigation and Improvement Audit (AIIIA) is a straightforward methodology to assess the actual status with respect to structural integrity issues. It addresses technical, managerial, organisational and practical topics across the entire organisation and aids acceptance by international insurance companies.

WATCH OUR VIDEOS

Quick overview of service portfolio

Detailed service portfolio video

What does asset integrity management involve?

Asset integrity management consists of 3 phases. In the analysis phase, we investigate existing asset management processes, procedures and tools in the mid-term service period. In the improvement phase, we assist in implementing optimised procedures as based on our recommendations in phase 1. In the stabilisation phase, we support you with performance management of these activities.

  • Phase 1: Asset Integrity Investigation and Improvement Audit (AIIIA)

    • Screening
    • Assessment of equipment – specific procedures
    • Detailed assessment of critical items
    • Inspection and maintenance procedures
    • Operating procedures
    • Spare parts and procurement
    • Training and qualification
    • Update of mechanical integrity framework
    • Final reporting including gap analysis, benchmark and action list
  • Phase 2: Improvement programmes

    • Management process optimisation
    • Risk-based inspection programmes
    • Fitness for service procedures
    • Process hazard analysis
  • Phase 3: Performance measurement

    • Implementation of reasonable KPIs
    • Performance checks
    • Regular audits and certification

EXPLORE

Advancing industrial power plant advantage
White paper

Advanced NDT

Learn about the commercial advantages of new NDT approaches and how to implement them

Learn more

Powering through performance
White paper

Performance Optimisation for Ageing Plants

Increase rated capacity, performance and lifespan.

Learn more

Powering through performance
Webinar

Performance optimisation of ageing plants

Learn how to improve your power plants energy efficiency.

Learn more

coal power plant
Infographics

Performance optimisation for ageing power plants

Improve the efficiency of your ageing power plant

Learn more

VIEW ALL RESOURCES

Next Steps

Site Selector