Reduce uncertainty and prevent costly missteps by mastering core PED expectations
Meeting the expectations of the Pressure Equipment Directive (PED) can be complex for engineering, QA/QC, and compliance teams across ASEAN, especially as requirements evolve and project timelines get tighter. Aligning early with the right technical expectations not only improves compliance but also helps teams avoid delays, rework, and inspection challenges.
In this webinar, our experts unpack the essential PED elements you need to understand, highlight recurring pitfalls observed in real ASEAN projects, and offer clarity on what regulators and Notified Bodies typically expect. You’ll also gain a short introductory update on emerging nuclear‑related requirements relevant to manufacturers and operators preparing for future demands.
Whether you’re involved in fabrication, welding coordination, project engineering, or conformity assessment oversight, this session provides practical guidance to help you make informed decisions and ensure smoother execution across PED‑regulated activities.
To view the webinar, fill in the form now.
Key takeaways
- Common pitfalls under PED and how they lead to unnecessary time and cost overruns.
- How early engagement with TÜV SÜD streamlines PED compliance, reducing rework and delays.
- Critical welding and quality assurance gaps that commonly result in certification challenges and how to avoid them.
- How to select the right PED module (B/D/D1/G) based on your manufacturing route and project needs.
- Upcoming trends in nuclear supply-chain qualification (EN ISO 19443) and how TÜV SÜD supports manufacturers entering or expanding in this sector.
Our webinar will tackle these points, focusing on:
- Typical areas where manufacturers lose time and money under PED, including documentation, material traceability, and inspection stages.
- TÜV SÜD’s approach to efficient PED compliance, starting from initial project alignment to final certification.
- Welding and QA considerations, such as WPQR/WPS readiness, NDT planning, and documentation controls that affect certification.
- Overview of PED Modules B, D, D1, and G, including criteria, application scenarios, and how TÜV SÜD guides clients in choosing the correct conformity assessment route.
- Short preview of EN ISO 19443, covering why nuclear operators demand it and how TÜV SÜD helps manufacturers strengthen their supply-chain positioning.