Case Study
Industry: Real Estate
Project Value: £85 million.
Construction dates: 2012 - 2016
Services provided: MEP, Energy, Sustainability & Vertical Transportation
Achievement: The scheme achieved a BREEAM ‘Excellent’ rating (74%), EPC of A (11) and a 40% reduction on internal water consumption compared to Building Regulations.
TÜV SÜD were involved in the design of the new £80M ScottishPower headquarters building in Glasgow city centre.
The 14 storey building extends to 220,000ft² and is intended to house up to 1900 staff.
The design team were appointed through Helical Bar and Dawn Developments but subsequently novated to Laing O’Rourke for the initial Cat A construction.
Through a direct appointment to ScottishPower we also undertook the design of the Cat B fit out covering a host of diverse facilities including a data centre, lecture theatre, full catering kitchen/restaurant and executive floor. We subsequently delivered further Cat C works to ScottishPower.
Laing O’Rourke employed a Design for Manufacturing and Assembly (DfMA) technique which saw 70% of the services product value being manufactured off site on modules. This resulted in 60% labour reduction on site as well as 30% programme reduction against a traditional installation.
Select your location
Global
TÜV SÜD Global
Asia
Europe
Austria
Belgium
Bosnia and Herzegovina
Croatia
Czech Republic
Denmark
France
Germany
Hungary
Italy
Netherlands
Poland
Romania
Slovakia
Slovenia
Spain
Sweden
Switzerland
Turkey
United Kingdom