Choose another country to see content specific to your location
//Select CountryHave a requirement or need some help? Contact us to find out how we can help you.
Case Study
Industry: Real Estate
Project Value: £20 million
Construction dates: 2016 - 2018
Services provided: MEP
This landmark hotel is located at Finnieston Quay, Glasgow. The project is in the vicinity of the iconic Finnieston Crane and the highly successful Hydro Arena and is the first “Radisson Red” Hotel to be built in the UK.
The project consists of 176 bedrooms and also provides Ground Floor Conference facilities, Bar, Restaurant and Gym, with supporting back of house services. The 9th floor “Sky Bar” with open terrace area features Private Dining at this level.
The Hotel incorporates state of the art IT facilities, with high emphasis on energy efficiency including the use of LED lighting, water saving devices, high efficiency plant and CHP.
As part of our collaborative approach to working with the Client and the design team, TÜV SÜD developed a coordinated M&E services model to BIM Level 2 from an early stage in the project design. This approach added significant value to the M&E scope of service by allowing efficiencies integral to the build and associated costs to be established at an early stage.
Select your location
Global
TÜV SÜD Global
Asia
Europe
Austria
Belgium
Bosnia and Herzegovina
Croatia
Czech Republic
Denmark
France
Germany
Hungary
Italy
Netherlands
Poland
Romania
Slovakia
Slovenia
Spain
Sweden
Switzerland
Turkey
United Kingdom